METAL LATHE COPPER COIL Copper Nickel Tube COPPER OIL PIPE MACHINE TOOL OIL PIPE
| Stainless Steel Seamless Pipe |
| Single Random Length and double Random Length. SRL:3M-5.8M DRL:10-11.8M or As clients requested length. |
| Size 1/4” to 24” Outside Diameter 13.7 mm to 609.6 mm |
| SCH10, SCH20, SCH30, STD, SCH40, SCH60, SCH80, SCH100 SCH120, SCH160, XS, XXS |
| Carbon steel, Low carbon steel, Alloy steel. |
| API5L , ASTM A106 Gr.B, ASTM A53 Gr.B, ASTM A179/A192/A213/A210 /370 WP91, WP11,WP22 GB5310-2009, GB3087-2008,GB6479-2013, GB9948-2013, GB/T8163-2008, GB8162-2008,GB/T17396-2009 |
| Carbon steel seamless pipes :Rust-proof black painting |
| T/T, L/C at sight, etc |
| 10-40 days |
| 1.Fluid pipe 2. Power Plant 3. Structure pipe 4. High and low pressure Boiler tube 5. Seamless steel tubes for petroleum cracking 6. Conduit pipe 7. Scaffolding pipe pharmaceutical and ship building etc |
| API5L ISO 9001:2008 TUV BV etc |
| Under 2 inch plain end. 2 inch and above Beveled |
If the quantity of order is not very big,we could send them to you by express delivery,such as TNT,DHL,UPS OR EMS etc.
If order is big ,we will advise you use Air Shipping or Sea Shipping through your nominated forwarder agent.Our long-term
cooperated agent also available.
FAQ
Q 1. What's the payment term?
A: We accept T/T 30% deposit and 70% balance against copy of B/L or L/C at sight, West Union,VISA,Paypal is also accepted.
Q 2. What is the normal lead time for product orders?
A: Average lead times for prototype / first article are 1-2 weeks, if tooling is involved, lead time for production tooling is 10
days, average production time after sample approval is 2-3 weeks.
Q 3. What is your standard packing?
A: All the goods will be packed by carton box and loaded with pallets. Special packing method can be accepted when needed.
Q 4. Could you please tell us the month capacity of your products ?
A: It depends on which model, we produce more than 2500 tons rubber materials per month.